How to Specify Spout Bottom on an FIBC Purchase Order
To specify a spout bottom on an FIBC purchase order, do not simply write “spout bottom.” Clearly identify it as a discharge spout bottom, then define the spout opening, spout length, closure method, liner configuration if applicable, product characteristics, required discharge rate, unloading equipment interface, body construction, top style, Safe Working Load, safety factor, fabric, lift loops, dimensions, tolerances, printing, and revision.
Here is the dangerous purchase-order description:
“White FIBC with spout bottom.”
That sounds specific.
It isn’t.
What size discharge spout?
How long?
How does it close?
What product is flowing through it?
What is the bulk density?
How fast should it discharge?
Does the spout need to connect to a hopper?
What happens if the product bridges?
Does the bag have a liner?
Does the liner have its own discharge outlet?
How much weight does the FIBC carry?
You get the idea.
The discharge spout is not just a feature.
It is the interface between your bulk package and whatever happens next.
Specify it accordingly.
What Does “Spout Bottom” Mean on an FIBC Specification?
Spout bottom means the FIBC has a defined discharge outlet incorporated into the lower portion of the bag.
During filling, handling, storage, and transportation, the outlet remains secured.
At the unloading point, the FIBC is positioned appropriately and the discharge system is accessed.
The product then exits through the bottom spout.
That is different from a flat bottom, where there is no conventional discharge outlet.
Use the Term “Discharge Spout Bottom” on the Purchase Order
This is clearer than simply writing:
Spout Bottom
Why?
Because FIBCs can also have filling spouts at the top.
Calling the lower outlet a discharge spout makes its purpose obvious.
A clear specification line might begin:
Bottom Construction: Discharge Spout Bottom With Closure
Then define the details.
Why “Spout Bottom” Alone Is Not a Complete FIBC Specification
Two FIBCs can both have discharge spouts and perform completely differently.
One may have a large outlet.
Another smaller.
One may use a different closure.
One may have a loose liner.
Another a form-fit liner.
One may contain free-flowing pellets.
Another a cohesive powder.
One may feed a hopper.
Another a mixer.
Same general bottom style.
Completely different applications.
What Information Should Be Included on a Spout Bottom FIBC Purchase Order?
At minimum, control these areas:
| Specification | What to Define |
|---|---|
| ⬇️ Bottom | Discharge spout bottom |
| 📐 Spout opening | Required outlet dimension |
| 📏 Spout length | Required length |
| 🔒 Closure | Required discharge closure |
| ⚙️ Equipment | Receiving/unloading interface |
| 🌊 Flow | Product flow characteristics |
| ⏱️ Discharge | Required flow or cycle requirements |
| 🔵 Top | Open, duffle, filling spout, etc. |
| 🏗️ Body | Circular, U-panel, four-panel, baffle, etc. |
| ⚖️ SWL | Required Safe Working Load |
| 🛡️ Safety factor | Required classification |
| 📦 Product | Material being packaged |
| ⚗️ Bulk density | Actual or approved range |
| 🧵 Fabric | Required FIBC fabric |
| 💧 Coating | Coated or uncoated |
| 🛍️ Liner | Type and discharge configuration |
| 🪢 Lift loops | Style and critical dimensions |
| 📐 FIBC dimensions | Required bag dimensions |
| 📏 Tolerances | Critical tolerances |
| 🏷️ Printing | Required identification |
| 📄 Revision | Approved specification revision |
The purchase order does not necessarily need paragraphs explaining each item.
A referenced controlled specification or drawing can contain the details.
But those details need to exist somewhere.
Specify the Discharge Spout Opening
This is one of the most important dimensions.
Too small and product flow may be restricted.
Too large and the product may discharge faster than the receiving system can comfortably accept it.
The correct opening depends on:
Product.
Particle size.
Flowability.
Discharge rate.
Receiving equipment.
Do not use an arbitrary “standard” outlet without checking the process.
Do Not Assume a Larger Discharge Spout Is Better
Bigger sounds faster.
Sometimes it is.
But faster is not automatically better.
If the receiving hopper, conveyor, mixer, or other equipment cannot accept the flow, you may create:
Overflow.
Spillage.
Dust.
Poor operator control.
The correct outlet is the one that matches the system.
Do Not Specify a Discharge Spout That Is Too Small
The opposite problem can be just as expensive.
A restricted outlet can increase:
Discharge time.
Bridging.
Operator intervention.
Residual product.
Production delays.
If throughput matters, outlet size matters.
Specify the Discharge Spout Length
The outlet needs enough length to function with the unloading process.
Too short and it may be difficult to connect or position.
Too long and excess fabric may interfere with handling.
Specify the required length based on the actual discharge setup.
Specify How the Discharge Spout Closes
Do not forget the closure.
The outlet must remain secured during:
Filling.
Handling.
Storage.
Palletization.
Nationwide transportation.
Receiving.
Movement to the discharge station.
Specify the approved closure configuration.
Do not assume every supplier uses the same method.
Specify How the Discharge Spout Is Accessed
How does the unloading system expose or access the spout?
Does the operator need to reach underneath the FIBC?
Does the unloading station support controlled access?
Is there enough clearance?
How is the closure operated?
The purchase specification should reflect the actual system.
Specify the Unloading Equipment Interface
This is critical.
The FIBC is not discharging into thin air.
Something receives the product.
A hopper.
Mixer.
Conveyor.
Bin.
Process vessel.
Material-handling system.
Specify any dimensions or requirements necessary for the spout to interface correctly with that equipment.
Call or Text us at 832.400.1394
Specify the Required Discharge Rate
How fast should the bag empty?
That is a much better question than:
“How big should the spout be?”
Start with the process requirement.
Maybe the downstream equipment can handle high flow.
Maybe it requires slower feeding.
Maybe production needs the FIBC emptied within a particular cycle.
Define the objective first.
Then design around it.
Specify Whether Partial Discharge Is Required
Does the entire FIBC empty at once?
Or does production need:
Some product now.
Stop.
More product later.
If partial discharge is important, document that requirement.
Do not assume every discharge-spout configuration provides easy stop-and-start control.
Specify the Product Being Packaged
Tell the supplier what is inside.
Powder?
Pellets?
Granules?
Resin?
Mineral?
Food ingredient?
Agricultural product?
Dry chemical?
The product affects how the outlet should be designed.
Specify Product Particle Size
Particle size matters.
But be careful.
Small particles do not automatically mean good flow.
A fine cohesive powder can flow worse than much larger pellets.
Particle size is one input.
Not the entire answer.
Specify Product Flowability
This may be more important than particle size.
Does the product pour easily?
Does it bridge?
Does it compact?
Does it clump?
Does it interlock?
Does it become cohesive?
Does moisture change its behavior?
The discharge spout must be selected around real product behavior.
Specify Whether the Product Is Free Flowing
If it is genuinely free flowing, say so.
That can help define the discharge application.
Free-flowing pellets and granules may behave very differently from cohesive powders or irregular products.
Do not group everything under “dry material.”
Specify Whether Bridging Is a Known Problem
If the product has a history of bridging, communicate it.
Do not hide the ugly parts of the process.
That information may influence:
Outlet dimensions.
Bag geometry.
Liner selection.
Discharge equipment.
Whether a conventional discharge spout is appropriate at all.
Specify Product Bulk Density
Bulk density affects FIBC sizing and payload.
It can also affect product behavior around the lower portion of the bag.
Provide a realistic value or approved operating range.
Do not design around a guess.
Specify the Target Payload
How much product should each FIBC contain?
The target payload and bulk density work together.
The FIBC should accommodate the intended amount without exceeding its rated Safe Working Load.
Specify Safe Working Load
State the required SWL.
Do not write:
“Heavy duty.”
“Extra strong.”
“Industrial bag.”
Those are descriptions.
Not load ratings.
Specify the FIBC Safety Factor
Document the required safety factor or intended-use classification where applicable.
And remember:
Safety factor is not extra working payload.
Do not exceed the stated SWL.
Specify the Top Construction Separately
Spout bottom tells you nothing about the top.
You still need to define filling.
Possible combinations include:
Open Top / Discharge Spout Bottom
Duffle Top / Discharge Spout Bottom
Filling Spout Top / Discharge Spout Bottom
The top and bottom solve different problems.
Specify them separately.
Specify Open Top With Spout Bottom When Broad Filling Access Is Required
A purchase specification might state:
Top Construction: Full Open Top
Bottom Construction: Discharge Spout Bottom With Closure
Then define the remaining technical requirements.
This provides broad filling access with controlled bottom discharge.
Specify Duffle Top With Spout Bottom When Top Closure Is Required
A duffle top can provide broad access during filling and closure afterward.
Specify:
Top Construction: Duffle Top With Closure
Bottom Construction: Discharge Spout Bottom With Closure
Again, define each end independently.
Specify Spout Top With Spout Bottom for Controlled Filling and Discharge
This configuration gives you:
Controlled inlet.
Controlled outlet.
A PO may state:
Top Construction: Filling Spout Top With Closure
Bottom Construction: Discharge Spout Bottom With Closure
Then specify the dimensions of each spout separately.
Do Not Automatically Make the Top and Bottom Spouts the Same Size
This is an easy mistake.
The filling spout interfaces with filling equipment.
The discharge spout interfaces with unloading equipment.
Those systems may have completely different requirements.
Define each spout around its job.
Specify the FIBC Body Construction
Spout bottom can be used with different body constructions.
Examples include:
Circular.
U-panel.
Four-panel.
Baffle.
Specify the required body separately.
Specify Circular Spout Bottom FIBCs Clearly
If circular construction is required:
Body Construction: Circular
Bottom Construction: Discharge Spout Bottom With Closure
Do not assume “spout bottom” communicates body style.
Specify U-Panel Spout Bottom FIBCs Clearly
Same principle:
Body Construction: U-Panel
Bottom Construction: Discharge Spout Bottom With Closure
Simple language prevents expensive assumptions.
Specify Four-Panel Spout Bottom FIBCs Clearly
If four-panel construction is required, state it.
The body affects filled shape and handling.
The discharge spout affects unloading.
Separate decisions.
Specify Baffle Spout Bottom FIBCs Clearly
If filled shape and cube efficiency matter, baffle construction may be appropriate.
Specify it intentionally.
Do not write “square bag” and assume everybody knows what you mean.
Specify Coated or Uncoated Fabric
The discharge style does not determine fabric requirements.
Coated fabric may improve fine-particle containment and resistance to moisture moving through the woven structure.
Uncoated fabric provides greater breathability.
Choose based on product and environment.
Specify Whether a Liner Is Required
If the product needs additional barrier protection, define the liner.
Do not stop at:
“Poly liner included.”
The liner needs to work with both filling and discharge.
Specify Loose-Insertion vs Form-Fit Liner
If liner geometry matters, specify it.
Loose liners may be economical.
But they can shift.
Form-fit liners provide more controlled geometry.
But they may add cost.
Choose based on the application.
Specify the Liner Discharge Outlet
This is where buyers get into trouble.
The outer FIBC has a beautiful discharge spout.
The inner liner does not cooperate.
Now product reaches the bottom and the liner becomes the bottleneck.
If the liner requires its own discharge outlet, define it.
Specify How the Liner Outlet Aligns With the Outer Spout
Alignment matters.
Especially in applications where the liner must remain positioned during discharge.
Document the intended configuration.
Do not assume it will somehow line itself up.
Specify the Liner Closure
The outer discharge spout has a closure.
The liner may need one too.
Treat them as separate components.
Specify both when applicable.
Specify Moisture-Protection Requirements
If moisture can damage the product, communicate the requirement.
Do not assume:
Coated = waterproof.
Lined = waterproof.
Closed spout = waterproof.
Define the actual exposure conditions and required protection.
Specify Dust-Control Requirements
Fine powders may require additional containment.
The discharge spout can help direct product.
But opening and emptying the bag can still create dust.
If dust matters, define the requirement.
Specify Contamination Requirements
If cleanliness matters, communicate it.
Contamination requirements can affect:
Fabric.
Liner.
Manufacturing.
Closures.
Handling.
Storage.
Discharge equipment.
Do not reduce the discussion to bottom style.
Specify Static Requirements When Applicable
Certain products and environments require electrostatic controls.
If static is relevant, specify the appropriate FIBC requirements separately.
Spout bottom does not determine electrostatic classification.
Specify Lift Loop Style
Lift loops matter during both handling and discharge.
The FIBC may need to hang above receiving equipment.
Specify the loop configuration that works with:
Forklifts.
Filling frames.
Discharge stations.
Other handling systems.
Specify Lift Loop Length
Loop length can affect total hanging height.
That matters because the discharge system has finite vertical space.
If the loops are longer than expected, the FIBC may hang lower.
If shorter, equipment interaction may change.
Control critical dimensions.
Call or Text us at 832.400.1394
Specify Overall FIBC Height
You need to understand the entire vertical package.
Lift loops.
FIBC body.
Discharge spout.
Receiving equipment.
Available clearance.
If total hanging height matters, specify and test it.
Specify FIBC Dimensions Clearly
Define the bag dimensions using a consistent convention.
Do not rely on a supplier to infer them from an old photo.
Remember that flexible FIBCs change shape when filled.
Specify Critical Dimensional Tolerances
Focus on dimensions that interact with equipment.
Examples may include:
Discharge-spout opening.
Spout length.
Loop length.
Overall bag height.
Filling-spout dimensions.
Critical footprint requirements.
Control what matters.
Do Not Over-Tighten Every Tolerance
FIBCs are flexible packaging.
Unnecessarily tight tolerances can increase complexity without creating value.
Identify the dimensions that actually affect equipment or performance.
Control those.
Specify the Required Filled Footprint
The empty FIBC does not tell the whole story.
Filled geometry depends on:
Product.
Body construction.
Filling method.
Baffles.
Settling.
If pallet and warehouse utilization matter, evaluate the filled bag.
Specify Pallet Requirements
Does the filled FIBC need to fit a specific pallet?
What level of overhang is acceptable?
How is it handled?
How is the discharge-spout area protected during palletization?
Document relevant requirements.
Specify Warehouse Requirements
Consider:
Filled shape.
Storage duration.
Stacking or storage method.
Moisture.
Temperature.
Handling frequency.
Product protection.
The discharge outlet needs to remain properly secured throughout storage.
Specify Nationwide Transportation Requirements
The bottom closure needs to survive the entire logistics process.
That can include:
Forklift handling.
Loading.
Vibration.
Transportation.
Unloading.
Warehouse transfers.
Repeated movement.
Specify the packaging for the complete journey.
Specify Outdoor Storage Requirements
If outdoor storage is expected, communicate it.
Consider:
UV exposure.
Rain.
Humidity.
Temperature.
Storage duration.
Surface conditions.
A closed discharge spout does not make the complete FIBC weatherproof.
Specify Printing and Label Requirements
Document required:
Product identification.
Warnings.
Handling instructions.
Traceability.
Company information.
Lot information.
Other markings.
Use controlled artwork where necessary.
Specify Empty-Bag Packing Requirements
How should empty FIBCs arrive?
Folded?
Baled?
Palletized?
Are liners already inserted?
How are discharge spouts positioned?
If receiving or production depends on the packing method, specify it.
Use an Internal FIBC Item Number
Give the approved bag an identity.
For example:
FIBC Item SB-315 — Rev. C
Now purchasing can reorder an exact controlled configuration.
Much better than:
“Same spout-bottom bag as before.”
Use Revision Control
FIBC specifications evolve.
Maybe engineering changes the discharge outlet.
Maybe operations changes the liner.
Maybe the filling equipment changes.
Maybe loop length changes.
Update the revision.
Do not let multiple versions of the same bag circulate under one vague description.
Do Not Rely on “Same as Last Time”
That phrase should make purchasing nervous.
Which last time?
Which supplier?
Which revision?
Which exception?
Reference the approved item number and specification revision.
Do Not Let Critical Spout Dimensions Live Only in Email
Operations requests a larger outlet.
Supplier agrees.
New bags work better.
Nobody updates the controlled specification.
Six months later purchasing orders from the old drawing.
Small outlet comes back.
That problem was preventable.
Update the document.
Do Not Specify Spout Bottom Based Only on Price
Supplier A may quote one outlet.
Supplier B another.
One includes a liner.
Another does not.
Closures differ.
Fabric differs.
Body construction differs.
Then purchasing sorts by unit price.
That is not comparison shopping.
That is comparing different bags.
How to Write a Spout Bottom FIBC Purchase Order Description
A useful PO description might follow this structure:
FIBC — [Top Construction] / [Body Construction] / Discharge Spout Bottom With Closure / [Required SWL] / [Required Safety Factor] / [Lift Loop Configuration] / [Coated or Uncoated] / [Liner Requirement] / Per Approved Specification [Revision]
Then reference the controlled drawing or specification containing the detailed discharge-spout requirements.
Example Spout Bottom FIBC Specification Structure
A controlled specification might include:
Top: Approved top construction
Body: Approved FIBC body construction
Bottom: Discharge Spout Bottom
Discharge Spout Opening: Per approved drawing
Discharge Spout Length: Per approved drawing
Discharge Closure: Approved configuration
Product: Approved bulk material
Bulk Density: Approved value or range
Target Payload: Approved fill weight
SWL: Per approved application
Safety Factor: Per intended-use requirement
Fabric: Woven polypropylene per specification
Coating: Coated or uncoated as required
Liner: Approved configuration if required
Liner Outlet: Per approved discharge configuration
Lift Loops: Approved style and dimensions
FIBC Dimensions: Per drawing
Critical Tolerances: Controlled dimensions
Discharge Equipment: Approved interface
Discharge Requirement: Approved process
Printing: Per controlled artwork
Packing: Per approved requirement
Revision: Current controlled revision
Now everybody is buying the same FIBC.
Example Open Top With Spout Bottom Purchase Order
For broad filling access:
Top Construction: Full Open Top
Bottom Construction: Discharge Spout Bottom With Closure
Then reference the approved discharge-spout dimensions and complete FIBC specification.
Example Duffle Top With Spout Bottom Purchase Order
For broad filling plus top closure:
Top Construction: Duffle Top With Closure
Bottom Construction: Discharge Spout Bottom With Closure
Then define the remaining requirements.
Example Spout Top With Spout Bottom Purchase Order
For controlled filling and controlled discharge:
Top Construction: Filling Spout Top With Closure
Bottom Construction: Discharge Spout Bottom With Closure
Then separately specify:
Top-spout dimensions.
Bottom-spout dimensions.
Top closure.
Bottom closure.
Equipment interfaces.
Do not assume the two ends are identical.
Spout Bottom FIBC Purchase Order Checklist
Before releasing the PO, confirm:
- Is Discharge Spout Bottom clearly stated?
- Is the discharge-spout opening specified?
- Is the discharge-spout length specified?
- Is the closure specified?
- Is the product identified?
- Is particle size understood?
- Is product flowability understood?
- Is bridging a concern?
- Is bulk density known?
- Is target payload known?
- Is SWL specified?
- Is safety factor specified?
- Is the top construction specified?
- Is the body construction specified?
- Is coated or uncoated fabric specified?
- Is a liner required?
- Is liner style specified?
- Is the liner discharge configuration specified?
- Does the liner align with the outer outlet?
- Is partial discharge required?
- Is required discharge rate known?
- Is unloading equipment identified?
- Does the spout fit that equipment?
- Are lift loops specified?
- Is overall hanging height acceptable?
- Are critical dimensions controlled?
- Does the filled footprint work?
- Are pallet requirements known?
- Are warehouse conditions understood?
- Are nationwide transportation requirements considered?
- Is outdoor exposure expected?
- Is the current approved revision referenced?
- Has the actual discharge process been tested?
If you cannot answer numbers seven, twenty-one, and twenty-two, you probably are not ready to lock the discharge-spout specification.
Common Mistakes When Specifying Spout Bottom FIBCs
Common mistakes include:
Writing only “spout bottom.”
Failing to distinguish filling spout from discharge spout.
Never specifying outlet dimensions.
Assuming bigger is better.
Making the outlet too small.
Ignoring spout length.
Ignoring closure.
Ignoring product flowability.
Ignoring bridging.
Ignoring bulk density.
Ignoring discharge rate.
Ignoring receiving equipment.
Ignoring partial discharge.
Ignoring the liner outlet.
Assuming the liner will automatically align.
Copying top-spout dimensions onto the bottom.
Ignoring loop length.
Ignoring total hanging height.
Ignoring pallet fit.
Ignoring nationwide transportation.
Ordering from a photograph.
Using “same as last time.”
And failing to control revisions.
Every one of those problems can be prevented before the purchase order is released.
What Purchasing Should Ask Operations
Ask:
How does the product actually flow?
Does it bridge?
How long does a bag take to discharge?
Do operators need to intervene?
Does the outlet feel too small?
Does product discharge too quickly?
Does the liner cause problems?
Can operators access the closure easily?
How much product remains after discharge?
What would make unloading easier?
Operations sees what the specification looks like in the real world.
What Purchasing Should Ask Engineering
Ask:
What outlet dimensions interface with the equipment?
What discharge rate can the receiving system handle?
What overall hanging height is available?
What loop dimensions matter?
What clearances are critical?
Does the outlet need to connect directly to equipment?
Which tolerances actually matter?
Those answers should make it into the controlled specification.
What Purchasing Should Ask Warehouse Teams
Ask:
Does the bottom remain secure during storage?
Does the filled FIBC sit properly on the pallet?
Does the discharge area create handling problems?
Does the bag overhang?
Do the loops remain accessible?
Does the filled shape work with warehouse positions?
Are there moisture or handling issues?
Warehouse feedback matters too.
Why Samples Matter Before Large Spout Bottom FIBC Orders
An empty sample cannot prove discharge performance.
Put the real product inside.
Fill it to the intended payload.
Move it.
Store it.
Handle it.
Position it over the actual receiving equipment.
Then discharge it.
Measure:
Connection.
Operator access.
Time.
Flow.
Bridging.
Dust.
Spillage.
Residual product.
Liner behavior.
That is a meaningful test.
How to Approve a New Spout Bottom FIBC
Do not approve it because:
“The sample looks good.”
Approve it because the complete system works.
Verify:
Filling works.
Target payload works.
Handling works.
Pallet fit works.
Storage works.
The closure remains secure.
The liner works.
The outlet interfaces with equipment.
Product starts flowing correctly.
Discharge rate is acceptable.
Product does not create unacceptable bridging.
Residual product is acceptable.
Cleanup is acceptable.
Then document the exact approved configuration.
How Detailed Should a Spout Bottom FIBC Purchase Order Be?
Detailed enough that nobody has to make a critical assumption.
The PO line itself can remain concise.
The referenced drawing should not.
The more the discharge spout interacts with equipment, the more important controlled dimensions become.
Why Standardizing Spout Bottom FIBC Specifications Saves Money
Once you establish a working configuration, standardize it.
That can improve:
Purchasing.
Quoting.
Receiving.
Quality control.
Operator training.
Inventory management.
Discharge consistency.
Supplier comparison.
Troubleshooting.
Repeat orders.
Most importantly, it prevents successful discharge geometry from disappearing on the next purchase order.
How to Compare Quotes for Spout Bottom Bulk Bags
Compare equivalent specifications.
Same product requirement.
Same SWL.
Same safety factor.
Same body.
Same top.
Same discharge-spout opening.
Same discharge-spout length.
Same closure.
Same fabric.
Same coating.
Same liner.
Same liner outlet.
Same loops.
Same dimensions.
Same printing.
Same packing.
Then compare price.
Otherwise you are comparing different FIBCs.
How to Avoid Receiving the Wrong Spout Bottom Bulk Bags
Remove ambiguity.
Do not order:
“Spout bottom super sacks.”
Order an approved specification.
Give it an item number.
Give it a revision.
Define the outlet.
Define the closure.
Define the liner.
Define the equipment interface.
Control critical dimensions.
And make the PO reference that specification every time.
The Best Way to Specify Spout Bottom on an FIBC Purchase Order
Start with:
Bottom Construction: Discharge Spout Bottom With Approved Closure
Then answer the real questions.
What product is inside?
How does it flow?
What is the bulk density?
What is the target payload?
How quickly should it discharge?
Where is it going?
What equipment receives it?
What outlet opening works?
What outlet length works?
How does it close?
Does the liner need its own outlet?
How does the liner align?
How high does the FIBC hang?
Can the operator access the discharge system?
Then specify the rest of the FIBC.
Top.
Body.
SWL.
Safety factor.
Fabric.
Coating.
Liner.
Lift loops.
Dimensions.
Tolerances.
Pallet requirements.
Warehouse requirements.
Nationwide transportation.
Printing.
Packing.
Revision.
Finally, put the real product in the real bag and discharge it through the real equipment.
That is the test.
Because the goal is not to buy an FIBC that technically has a discharge spout.
The goal is to buy an FIBC whose discharge spout works so well with your product and equipment that nobody on the production floor has to think about it.
Product flows.
Equipment receives it.
Bag empties.
Production continues.
That is what a properly specified spout bottom is supposed to do.